Software QA/Testing
Glossary and Technical FAQs

|
|
|
Q: How do you execute tests?
A: Execution of tests is completed by following the test documents in a methodical manner. As each test procedure is performed, an entry is recorded in a test execution log to note the execution of the procedure and whether or not the test procedure uncovered any defects.
Checkpoint meetings are held throughout the execution phase. Checkpoint meetings are held daily, if required, to address and discuss testing issues, status and activities.
-
The output from the execution of test procedures is known as test results. Test results are evaluated by test engineers to determine whether the expected results have been obtained. All discrepancies/anomalies are logged and discussed with the software team lead, hardware test lead, programmers, software engineers and documented for further investigation and resolution. Every company has a different process for logging and reporting bugs/defects uncovered during testing.
-
A pass/fail criteria is used to determine the severity of a problem, and results are recorded in a test summary report. The severity of a problem, found during system testing, is defined in accordance to the customer's risk assessment and recorded in their selected tracking tool.
-
Proposed fixes are delivered to the testing environment, based on the severity of the problem. Fixes are regression tested and flawless fixes are migrated to a new baseline. Following completion of the test, members of the test team prepare a summary report. The summary report is reviewed by the Project Manager, Software QA Manager and/or Test Team Lead.